New York State Standards and Specifications for
Erosion and Sediment Control 

(Follow below links to PDF chapter files)

Cover, Preface, Contents &  Acknowledgments (216 KB)
Section 1 Introduction (35 KB)

Section 2 Resource Planning (218 KB)

Section 3 Vegetative Measures (4.2 MB)

Section 4 Biotechnical Measures (3.0 MB)

Section 4 Structural Measures (500 KB)

Section 5a - 1 to28 Temporary Structural Measures (1.9 MB)

Section 5a - 29 to 64 Temporary Structural Measures (5.8 MB)

Section 5a – 65 to 90 Temporary Structural Measures (3.7 M)

Section 5b 1~26 Permanent Structural Measures (6.1 MB)

Section 5b 27~53 Permanent Structural Measures (3.9 MB)

Section 5b 54~64 Permanent Structural Measures (1.2 MB)

Appendix A Revised Universal Soil Loss Equation – RUSLE (1.5 MB)
Appendix B Performance Evaluation (29 KB)

Appendix C Cost Analysis (43 KB)

Appendix D Fertilizer Label (123 KB)

Appendix E Small Homesite Construction (8.0 MB)

Appendix F Sample Plan (21 KB)

Appendix G Plan Review Checklist (51 KB)

Appendix H Construction Site Log Book (74 KB)

Directories (617 KB)

Glossary (77 KB)

for more information contact:
Robert Doscher, Principal Environmental Planner
Westchester County Department of Planning
148 Martine Avenue, Room 432
White Plains, NY 10601
(914) 995-4423
rrd1@westchestergov.com


|Back to Top|   |Planning Dept. Home Page|  |Westchester Home Page|